Location: National highway 22, Tan Phu Trung ward, Cu Chi district, HCMC (11 km from the downtown)

+ Away from the center of Ho Chi Minh City: 25 km

+ Away from the Tan Son Nhat airport: 15 km

+ Away from the port of SaiGon: 27 km

Area: 542,64 ha

Infrastructure:

  • Traffic: Complete the internal roads
  • Power supply: Cu Chi station 110/22 KV
  • Water supply: IZ stations with the capacity of 4.500 m3/day; Kenh Dong station (under construction) with the capacity of 300.000 m3/day
  • Waste water treatment plant: (phase 1 – capacity 4.000 m3/day and will upgarde to 7.000 m3/day)
  • Land lease: area of the minimum lease 10.000 m2
  • Factory lease: area of the minimum lease 2.000 m2
  • Land lease price: 65 USD/m2
  • Power station: (average) common price
  • Water price: 0.46 USD/m3
  • Waste water treatment fee: 0,3 USD/m3

Developer: Northwest Saigon City Development Corporation (SCD)

  • Address: National highway 22, Tan Phu Trung ward, Cu Chi district, Ho Chi Minh City
  • Tel: (84.8) 3796 5862
  • Fax: (84.8) 3796 3378
  • Hotline: +84 934 910 919
  • Email: scd@tanphutrung-iz.com
  • Website: www.tanphutrung-iz.com

Tan Phu Trung Industrial Zone

OUR BUSINESSESExplore our ecosystems

lusacreallogo
lusaclandlogo
lusacmedicallgo
lusacindustriallogo
lusaclogo
lusacfurniturelogo
pdrealogo
pdindustriallogo
lusacconslogo
lusaclawlogo
https://www.lusacgroup.com/wp-content/uploads/2024/09/binhminhbalanglogo.jpg

© 2025 LUSAC GROUP CORPORATION. All Rights Reserved.